Take a drawing for one aluminum casting, about 1.6 m square and 1.3 m tall, that replaces dozens of stamped and welded parts. Most of it stays as cast. The work is in the bores, pads and bonding faces that tie it to the rest of the body, and those few features now decide more of the final body fit than they used to.
Researchers at Chalmers University and Volvo Cars explain why. A welded body has lap joints that let slightly off-nominal parts still go together. A megacasting removes most of those joints, so a deviation can’t be absorbed at an intermediate assembly stage; it has to be right on the part.
So machining a megacasting comes down to two jobs: locating a part that’s never quite the same shape twice, and reaching every feature on something bigger than most machining centers. That puts demands on working height as well as travel, on side access, spindle speed, chip removal and probing, and on the hydraulic plumbing for the fixture.
Only the interfaces get machined
MAPAL, which supplies tooling for these parts, lists what a typical megacasting asks of machining: walls of 2 to 5 mm, defined surfaces for adhesive bonding, several bore diameters, and diameter tolerances around ±0.05 mm. Drilling has to be low-burr, without a cap of material left at the hole exit.
That’s tighter than standard die-casting tolerances. Under NADCA’s 2021 standards, the standard linear tolerance on an aluminum casting is ±0.25 mm over the first inch (25.4 mm), and it widens with length. Mounting bores, joint faces and bonding pads get machined; the large cast surfaces between them are left alone.

Locate from the casting, then from what you machined
An as-cast surface isn’t a reliable edge to indicate from. The usual answer is datum targets: small defined spots on the cast surface, three for the primary plane, two for the second and one for the third. NADCA adds a specific rule: you get the best results when the casting is located from datum points in the same die half as the feature you’re machining, because the parting line and moving die parts add their own variation.
One die-casting engineer on the Eng-Tips forum described the sequence his shop uses on aluminum die castings. The casting sits on cast datum targets, a round pin goes into a cast hole and a diamond pin into a cast slot, and the first operation machines a face and two dowel holes. Those machined features become the datums for everything after, still referenced back to the cast ones.
Mark the cast datum targets on the drawing and show how they relate to the first machined datums. The fixture and the machine setup are planned from both.
Before the first cut, a spindle probe touches a few cast features to confirm the part is sitting where the program expects. If it isn’t, you find out before you’ve cut a pad in the wrong place.
Keep the stock small. NADCA notes that a die casting’s densest, finest-grained material is near the surface. For large castings its guideline is no more than 1.5 mm of machining stock, with a normal minimum of 0.25 mm to limit tool wear and exposed porosity. Extra stock added to cover distortion cuts into less dense material and opens up more porosity.
If the part moves when the clamps come off, that’s a fixture and residual-stress question rather than a machine one. We worked through how to separate those causes in our article on aerospace rib distortion.
What the machine needs
Check these before you quote the job, with the fixture drawn in place. Start with the envelope: if the casting and fixture don’t fit, nothing further down the list matters.
- Working height, not just travel. Check the clear width and height under the gantry with the fixture in place, and whether the longest tool still clears the top of the casting with the spindle fully up. A 1.3 m tall casting rules out many gantries whose X and Y travel would be fine.
- Side access. Many interfaces face sideways. A right-angle head reaches them in the same clamping. BIG DAISHOWA’s John Zaya makes the case that turning the tool is often cheaper than unclamping a large part and craning it over, and that positional tolerances hold better when several faces are cut in one setup. Long tools reaching around ribs are what MAPAL flags as vibration-prone on these parts.
- A spindle for aluminum. The work is drilling, tapping and light milling in aluminum, often with PCD tools. A high-speed BT40 or motor spindle suits it better than a low-speed BT50 belt spindle built for steel.
- MQL or dry cutting, and chip removal. MAPAL lists MQL as the lubrication for these alloys. Without flood coolant washing the part, chips settle in pockets and between ribs. Plan first how they leave the part, by air blast or by the order the pockets are cut, then make sure conveyors clear the table’s full length.
- Probing. A workpiece probe and the control cycles to use it, so every casting is checked against its datum targets before cutting.
- Fixture interface. Hydraulic supply to the table, and clamp signals that the control reads before it allows cycle start.
- Air time. SW, a German machine builder that works on these parts, says that in aluminum machining the non-productive time is significantly higher than the cutting time. Rapid traverse, tool-change time and the order of features matter as much as spindle power.


Where megacasting jobs go wrong
- A generic fixture. SW’s view is blunt: the machine’s precision isn’t the problem. Distortion comes from stresses in the casting, so the clamping device has to be developed for the specific component.
- Best-fitting the whole scan. Fitting all the scan points at once can hide a locator that moved. Align to the datum targets the assembly uses, then look at the locators.
- Thin walls behind the drill. With 2 to 5 mm walls there’s little material at the hole exit, which is why MAPAL puts low-burr drilling without an exit cap on its list.
- The wrong machine for series volume. At full body-line rates, compare the takt time you need with the cycle time one spindle can hold. If one machine can’t keep up, put a purpose-built multi-spindle machine into the comparison; Sugino’s Gigafeeder, for example, drills and taps body castings with four spindles as standard. A gantry suits prototypes, launch volumes, die trials and service parts, and smaller structural castings.

How we’d set up a machine for structural castings
We’ve built machines for customers who machine structural die castings. For a casting with a footprint around 1.6 × 1.6 m, we’d start from our LP2518 gantry: 2,700 × 2,000 × 800 mm travel, a 2,700 × 1,600 mm table and 1,820 mm between the columns. Its standard working height is about 1 m, so a part around 1.3 m tall needs a raised gantry, which we build to order.
For this work we’d fit a BT40 or motor spindle at 12,000, 15,000 or 18,000 rpm instead of the BT50 belt spindle, add a right-angle head for the side features and a workpiece probe, and set the machine up for MQL or dry cutting, with a chain conveyor and augers to clear the table. The table gets hydraulic lines for the fixture.
Smaller structural castings with features on several sides are worth putting on a horizontal machine. Our LW1814 has 1,800 × 1,400 × 900 mm travel and a 2,000 × 900 mm table rated to 1,600 kg; with a rotary table it reaches several faces in one clamping.
If the casting is moving from manual clamps to a hydraulic fixture, plan the machine side at the same time: room under the gantry for the fixture height, hydraulic supply to the table, and clamp signals into the control. Send us the casting model and the list of machined features through our inquiry form, and we’ll work out the machine configuration and fixture interfaces with you.
FAQ
What does gigacasting mean?
Gigacasting and megacasting are two names for the same process: high-pressure die casting of large, single-piece aluminum body structures that replace many stamped and joined parts. Some of the presses involved exert more than 9,000 tons of clamping force, and the technology drew wide attention after Tesla put it into production.
What are the standard tolerances for aluminum die casting?
NADCA’s standard linear tolerance for aluminum is ±0.25 mm for the first 25.4 mm (1 in) plus ±0.025 mm for each additional 25.4 mm; the precision grade starts at ±0.05 mm. Those figures apply only within one die half. Dimensions across the parting line or formed by moving die parts get extra tolerance.
What machining is involved in die casting?
After casting, the part is trimmed to remove the gates, overflows and biscuit, usually in a trim press. Machining comes after that and is limited to features the die can’t hold: drilled and tapped holes, bored seats and milled faces. Large structural castings are often quenched before machining, and the Chalmers–Volvo study names quenching as one of the main influences on distortion.
Sources
- MAPAL, Gigacasting / megacasting: machining requirements and challenges.
- Wärmefjord, Hansen and Söderberg, Experimental and industrial insights into distortion control for megacasting, Procedia CIRP 145 (2026) 252–257.
- NADCA, Product Specification Standards for Die Castings, Section 4A: Tolerancing (2021).
- Eng-Tips forum, Casting datum features (2021).
- SW Schwäbische Werkzeugmaschinen, Giga casting (2024).
- Sugino, Gigacasting: machining for large automotive parts.
- BIG DAISHOWA, Flip the Part or Flip the Tool?